Site Meter Watching Studio60 » Blog Archive » Recap - Episode 5 - The Long Lead Story

Recap - Episode 5 - The Long Lead Story

by

This episode mainly concentrated on Christine Lahti as she interviews the various cast members for her lead story in Vanity Fair. Although the story is supposed to be about the show, we get the feeling that she is way too interested in the realtionship between Matt and Harriet.
We also see Jordon refusing to sign up a new reality show because it is tasteless, despite being almost ordered to do so by Steven Weber. They even take it to the top, where Jordon wins out.
Highlight of this week’s episode was the music of Sting, who played the lute.


Leave a Reply


About Watching Studio60

Studio 60 on the Sunset Strip was a show about making a show -- a Friday night sketch comedy living and dying by the ratings and the buzz and the bottom line. It also turned out to be about the ways that overinflated expectations and caustic criticism can doom a TV drama. Still, if you're a fan of great acting and Aaron Sorkin's way with dialog, there's a lot to love in Studio 60's sole season. Read here to look back at the show, and look forward at what the cast and creative powers are doing now.

Watching Studio60 Author(s)

Blogging Flair